페이지

2010년 10월 1일 금요일

project 2 - Mapping Sound (day 3)

1 October 2010, Friday

Today we have to finish everything include ongoing document, blog, group and individual sound of music and burned Audio CD. We are starting to present on 12pm, so everything must finish before 12pm. I was finished my individual project already but need to do journal and blog. I and my team rushed to finish everything and prepare for the presentation. The presentation has started in the Chroma key room at 2pm. our team don't want to go at last so, we decide to present first.

Basically, our team project is to listen and think difference between natural and industrial sound. At the starting of the music, we put natural and industrial together to express the difference. After that, we bring up the both sounds one at a time. After 45 seconds passed, we changed to the natural sound and drop the volume slightly.

In my individual project is same meaning but way different of the team project. I start with bird sound and compare and mix the sound but only use natural sound. And I stopped the music and pause 2 second. Then, I start the industrial sound with starting up the vehicle's engine. The industrial sound and it reaches unto nearly end. At the end, I put the elevator with sounds 'Let's stopping ground floor'.

Once all presentation have finished, I upload the original sound we've used. Also, I visit the Aporee Website to upload original sound to actual place for requirement.



group sound walk :








individual sound walk:




댓글 없음:

댓글 쓰기